Transforming a long vacant site adjacent to the city’s inner circuit road and William Jessop’s Floating Harbour, the Assembly Bristol campus is anchored around a waterfront park, creating a new city place that positively engages with the city, brings colour to the skyline and links the waterside with a restored historic street, Cheese Lane.

A hierarchy of three buildings shape the space and frame a connecting vista from Pip and Jay Church to the waters edge. These three buildings unify the campus whilst possessing a distinct character of their own. Building A, now the Bristol headquarters of British Telecoms, is long and narrow, holding the street edge and protecting the waterfront park from the clamor of traffic. It lifts and spans Cheese Lane with a heroic structure to create a lofty entrance portal into the campus centre.

Building B is the smaller of the trio standing at 7 storeys, enjoying a gentle waterside setting whilst Building C, the tallest of three buildings reaching 14 storeys, brings sculptural height over the public realm.

The new buildings provide a variety of commercial floorplates, with an assortment of retail, restaurant and flexible units at ground level totaling 320,000 square feet.

At the ground, the buildings are connected by a large and generous waterfront park that fronts onto the Floating Harbour with well planted borders and mature trees. Seating and rest spaces are provided in the sculpted amphitheater steps which give an opportunity for external exhibitions and performance, then lead to the planted podium street that frames the Pip and Jay Church. The area is complemented by artwork from Alex Chinneck, bringing a subversive sculptural edge to the public realm. 

The campus champions sustainability and innovation, reducing embodied carbon through exposed structures which celebrate the building’s mechanics. Modern methods of construction supported a lean and efficient approach and have delivered a 26% saving on carbon emissions compared to other new build office developments in Bristol. Air source heat pumps and on floor plant further reduce operational carbon consumption and flexibility is there for tenants to install passive and mix mode solutions in the future. 

The result is three buildings which reflect Bristol's distinctive neighbourhoods, communicating through bold and bright colours that celebrate the structure and facade and set the campus apart from its contemporaries.  

Awards
  • 2025 AJ Architecture Awards - Highly Commended, Workplace Project (£10 million and over)
  • 2025 BCO South of England and South Wales Award - Innovation
  • 2026 RIBA South West & Wessex Award
2024
Location
Bristol, UK
Client
AXA Real Estate & Bell Hammer Ltd
Architect
Allford Hall Monaghan Morris
Project Manager
Gardiner & Theobald
Quantity Surveyor
Currie & Brown
Structure
Arup
Services
Hoare Lea
Contractor
Galliford Try Group
Agent
Savills / JLL
Public Art
Alex Chinneck
 
Related

Assembly Bristol wins an RIBA South West & Wessex Award 11.05.26

RIBA South West Award Shortlist 12.02.26

Assembly Bristol Highly Commended at the AJ Architecture Awards 28.11.25

AJ Architecture Awards 2025 Shortlist 26.08.25

BD Architect of the Year Awards 2025 shortlist 02.07.25

BCO South of England and South Wales 2025 Awards 02.05.25

BCO Awards 2025 Finalists 31.01.25

Insider South West Property Awards 2024 shortlist 25.09.24

Bristol Open Doors 2023 10.10.23

Assembly Bristol tops out 06.08.20

BT pre-lets Assembly Bristol 21.10.19

Assembly Bristol starts on site 19.02.19

Planning approval for Assembly Bristol 16.03.17