Barking Central

London. 2010

  • Project Details
  • Completion: 2010
  • Cost: £71 Million

Barking Central links commercial needs with civic engagement to breathe life into what had become something of a forgotten Thames Gateway backwater. A cluster of new buildings – a diverse mix of forms, heights, tones and textures – are positioned around the existing Barking Town Hall to capture a civic square and reintroduce historical routes. Phase one, completed in 2007, is a U-shaped block of apartments perching on a colonnade of v-shaped props. The apartments sit above the new Barking Learning Centre that has been reinvented out of an aging public library. Phase two, completed in 2010, comprises five more buildings; three residential blocks, a 66-bed hotel and a bicycle shed for 250 bikes. The Lemonade Building, the tallest of the residential towers at 17-storeys, signposts the project from the A13 and beyond. Drawing inspiration from the site’s former R Whites factory and the leaf tones of the central arboretum, the overall colour scheme not only binds together the cluster of buildings but emphasises the protruding balconies and recessed loggias. The project is the result of a drawn-out dance between public and private interests and stands as a lived-in symbol of the wider-scale regeneration of the area.

Awards

New London Award for Joint Overall Winner 2011 New London Award for Placemaking 2011 RIBA Award for Architecture 2011 Building for Life Award 2010 Building for Life Silver Standard 2010 Housing Design Award 2010 London Planning Awards: Best New Public Space 2010 World Architecture Festival: Commended 2010 Brick Awards: Best Use of Brick and Clay Products 2009 British Construction Industry Awards: Local Authority Award 2008 European Prize for Public Urban Space 2008 MIPIM Best Mixed Use Award 2007 Housing Design Award 2005

Related Projects

Client: Redrow Regeneration (Barking) Ltd & London Borough of Barking & Dagenham 


Architect: Allford Hall Monaghan Morris Architects


Project Manager: Gill Associates


Quantity Surveyor: Nigel Rose LLP


Structural / Civil Engineer: Buro Happold Ltd


Services Engineer: Faber Maunsell


Landscape Architect: Grant Associates


Public Realm Architect: muf architecture/art


Fire Consultant: Buro Happold Ltd (Fedra)


Accessibility Consultant: Buro Happold Ltd


Highways Consultant: Buro Happold Ltd


Acoustic Consultant: Bickerdike Allen Partners


Planning Consultant: Hepher Dixon (246 scheme) and Robson Planning Consultancy (up to 206 scheme)


Planning Supervisor: Tweeds Project Services


Approved Inspector: NHBC


Main Contractor: Ardmore Construction Ltd


Graphic Design: Studio Myerscough


Sub-Contractors:M Price Ltd (BLC Cladding & Glazing), Cladding UK (Residential Cladding)


Suppliers: Leiab (Resi Windows), Schuco (BLC Cladding) Quinze & Milan/ SCP and Vitra (BLC Furniture)


BLC Stakeholders: London Borough of Barking & Dagenham, Barking College and University of East London


return to top