The Bower reaches practical completion

13/09/2018

The Bower reaches practical completion

The Bower Phase 2 has reached practical completion. The mixed use development transforms a group of 1960s buildings on Old Street roundabout into a coherent mix of workspace, ground floor retail, restaurants and public realm, with a new pedestrian link from Old Street through to Baldwin Street. The second phase has seen the most dramatic reinvention on site: the 17 storey tower has been stripped back to its original slab and the floorplate extended north and south, creating interconnecting double height spaces. Fit out begins in autumn 2018, with the first occupiers aiming to move in by Christmas.