• Projects
  • News Archive
  • About Us
  • Contact Us
  • DONE
  • DOING
  • TIME
  • TYPE
  • SCALE
  • AWARDS
  • VIDEOS
  • ‹£5M
  • ‹£10M
  • ‹£50M
  • Angel Building
  • Adelaide Wharf
  • Barbican Arts Centre
  • Barking Central I
  • Barking Central II
  • The Farmiloes Building
  • The Horseferry Building
  • Johnson Building
  • KX 200
  • MoMo
  • Monsoon Building
  • Notting Hill Village
  • Runcorn
  • Tooley Street
  • Westminster Academy at the Naim Dangoor Centre'
  • ›£50M

ADELAIDE WHARF

Adelaide Wharf
  • Completion: 2007
  • Cost: Ā£22 million
  • Client: First Base
  • Awards:
  • RIBA National Award for Architecture 2008
  • Housing Design Award 2008
147 apartments and some offices extruded into a prototype block that is then folded to create a U-shaped court fronting onto canal, an axial route and a park. The extrusion is cut away at ground to allow glimpses into a leafy communal courtyard. Each apartment has an outdoor room part hung part cantilevered out over the streets. The building’s facade is composed of layers of roughly sawn larch that makes reference to the warehouses of packing crates that once occupied this site.
DOWNLOAD DRAWINGS PDF arrow
PLAY VIDEOS arrow